Projects
“No longer does the world belong to the ones with the most information, but to those with the highest ability to make sense of it; no longer to those who know more but to those who understand it better.” The best answers come from the best questions, the best questions come from the deepest understanding.
Case #1
Revolutionized Large Frameless Cabinet Manufacturing
- Successfully deployed an ERP System, seamlessly integrated with machine optimization and post-processing capabilities.
- Conceived and executed a comprehensive layout overhaul, incorporating state-of-the-art machinery.
- Enhanced the structural integrity and lamination quality of our cabinets.
- Achieved an impressive yield boost from 73% to an impressive 89%.
- Skyrocketed productivity by a remarkable 80%.
- Expanded our production capacity by a substantial 40%.
- Dramatically reduced Work-in-Progress (WIP) and internal lead times, slashing them from 5-7 days to just 24 hours.
Case #2
Enhanced Manufacturing for Large Framed and Frameless Products
- Introduced a novel door-building process for superior quality.
- Implemented efficient batching and common-line routing strategies for box components.
- Incorporated pre-finished face frames, combining a flat-line finishing approach with a seamless “attached” appearance for finished ends.
- Optimized job batching into factory orders, streamlining flat-line operations.
- Enhanced loading efficiency on flat production lines.
- Elevated door construction quality, eliminating open or loose joints.
- Bolstered plant capacity by a notable 30%.
- Augmented panel yield by an impressive 11%.
- Boosted direct labor productivity by a remarkable 50%.
Case #3
High-End Residential Furniture Manufacturer
- Strategic Relocation of Furniture Production from New York to Georgia.
- Revamped the factory layout, incorporating cutting-edge machinery to optimize workflow and achieve a balanced plant load.
- Enhanced the finishing areas to elevate the quality of our products.
- Dramatically increased both production capacity and overall productivity.
Case #4
Specialty Molding Producer for the World’s Leading Building Products.
- Innovated new tooling solutions to elevate our performance.
- Enhanced feed rates and molding quality across all molding processes.
- Streamlined rip sizes for optimal molding efficiency.
- Achieved significant annual savings of $250,000 in tooling expenditures.
- Ramped up production capacity by an impressive 50%, with a corresponding increase in labor efficiency.
Case #5
High End Cabinetry Manufacturer
- Conceived and Executed an Innovative Finishing System, Utilizing 2K Polyurethanes, to Achieve Exceptional Cabinet Finishes.
- This strategic move not only bestowed a competitive edge but also amplified our up-selling potential, leading to a remarkable fourfold increase in sales over the course of six years.
Case #6
Door building
- Revisioned door building process for large national kitchen cabinet manufacturer.
- Results doors with super joints and no pins, improved productivity, higher customer satisfaction.
- Are ready for the Super Cabinet Door?
Case #7
High End Finishing
- We designed, trained and implemented a conversion of finishing for a high-end cabinet manufacturer switch from a traditional conversion varnish to a high end solvent based 2K Urethane resulting in a stunningly superior finish that helped increase volume and profit by creating a distinct strategic advantage.
Accomplishments
- Engineered and Constructed the Largest Frameless Cabinet Manufacturing Facility in the United States.
- Successfully Designed and Installed 12 Flat-Line Finishing Systems.
- Orchestrated the Implementation of ERP Systems for Wood Product Manufacturers across Six Different Companies and Their Plants, Resulting in a Sustained Enhancement of EBITDAh.
- Skillfully Developed and Executed Factory Layouts for 15 Woodworking Companies – New and Existing Facilities.
- Provided Meticulous and Effective Due Diligence for Merger and Acquisition Support.